Gas platform Lunskaya-A
Technical supervision during construction, connection and commissioning of offshore gas production platform.
![Ultrasound by phased array](https://static.wixstatic.com/media/c4219b_81aa58b4c4c54b12b6fb8d03a9081c26~mv2_d_5587_3717_s_4_2.jpg/v1/fill/w_147,h_98,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/c4219b_81aa58b4c4c54b12b6fb8d03a9081c26~mv2_d_5587_3717_s_4_2.jpg)
Ultrasound by phased array
Inspection of pipelines in operation by NDT methods.
![Offshore stationary platform PA-B](https://static.wixstatic.com/media/c4219b_8b68a022921a46fd9b02b39a23a3c949~mv2.jpeg/v1/fill/w_147,h_98,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/c4219b_8b68a022921a46fd9b02b39a23a3c949~mv2.jpeg)
Offshore stationary platform PA-B
Technical supervision of Assembly and installation of deck crane boom.
![Gas platform Lunskaya-A](https://static.wixstatic.com/media/c4219b_06f326fa73964f73932d18133bc0233f~mv2_d_4821_2646_s_4_2.jpg/v1/fill/w_147,h_81,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/c4219b_06f326fa73964f73932d18133bc0233f~mv2_d_4821_2646_s_4_2.jpg)
Gas platform Lunskaya-A
Technical supervision during construction, connection and commissioning of offshore gas production platform.